Gable end of a new home sheathed in ZIP System panels, with open roof trusses and wall framing visible through the front opening

ZIP System Installation in Jacksonville, FL

ZIP System sheathing and tape installed by the same crew that frames the building, so the air and moisture barrier goes on as soon as the walls go up.

  • Free Estimates
  • Licensed & Insured
  • 20+ Years in Business
  • Replies Within 24 Hours

ZIP System Sheathing, Installed by the Framing Crew

ZIP System panels combine the wall and roof sheathing with a built-in water-resistive barrier. Once the seams are taped, the building has a continuous air and moisture barrier without a separate layer of housewrap. In Florida humidity and afternoon storms, that matters from the first day the frame is up.

Because our crew installs the ZIP System as part of the framing, you have one less subcontractor to schedule and no gap between framing and wrap. The panels go on, the seams get taped, and the openings get flashed, all before we hand the building over.

ZIP System only performs when it is installed right. That means proper nailing, taped seams, and clean details at windows, doors and transitions. We do those details the same way on every job, whether it is a single home or a three-story apartment building.

What's Included With ZIP System Installation

ZIP System wall sheathing

ZIP System roof sheathing

Seam taping with ZIP System tape

Window and door opening details

Nailing to the manufacturer and plan requirements

Installed during framing, with no wait for a wrap crew

Our Framing Projects

Gable end of a new home sheathed in ZIP System panels, with open roof trusses and wall framing visible through the front opening
Multifamily job site seen from above, with ZIP System sheathed buildings, a telehandler and roof trusses staged on the ground
Three-story apartment building framed and sheathed in green ZIP System panels while a crane lifts a roof truss
Large custom waterfront home framed and wrapped in green ZIP System sheathing, with a framer on a ladder at the front entry

From Plans to Finished ZIP System Installation

You get a price before any work starts. Nothing is added later.

01

You send the plans

Use the form, call or email us your blueprints and timeline. We reply with real numbers, usually within 24 hours.

02

We go over the job with you

We walk through the plans, the site and your schedule, then staff the right size crew for the scope.

03

We frame it to spec

We build exactly to the plans and the Florida Building Code, so the framing inspection goes smoothly and the next trades can start.

Where We Frame Around Jacksonville

Based in Jacksonville and framing across Duval, Clay and St. Johns counties.

We also travel for framing projects in Daytona Beach, Palm Coast, Orlando, Tampa and Savannah, GA. See all service areas

Worked With EJT Framing?

Tell other builders and homeowners how the job went. It takes about a minute.

Leave us a review

Want ZIP System on Your Next Build?

One call gets you real numbers, not a sales pitch. Free estimates, no obligation.